The project included:
- Hydraulic modelling of Jacksons Creek.
- Investigation of various alignment options and initial concept bridge designs.
- Preparing design for the preferred alignment including detailed concept bridge design and detailed design for the complex horizontal and vertical road alignments.
- Preparation of detailed risk-based cost estimates at the P50 and P90 level.