Lockerbie Development Contribution Plan – preparation of concept bridge designs and cost estimates

The project included:

  • Hydraulic modelling of approx. 5km of Merri Creek to Melbourne Water requirements.
  • Preparing detailed concept design for bridges at 4 No. locations including approach roads.
  • Preparation of detailed risk-based cost estimates at the P50 and P90 level.