Diggers Rest – Bulla Rd crossing of Jacksons Creek

The project included:

  • Hydraulic modelling of Jacksons Creek.
  • Investigation of various alignment options and initial concept bridge designs.
  • Preparing design for the preferred alignment including detailed concept bridge design and detailed design for the complex horizontal and vertical road alignments.
  • Preparation of detailed risk-based cost estimates at the P50 and P90 level.